Preamble Court construction project
March 28th:  empty lot to the west of our existing home
May 15th:  broke ground
May 29th: finished foundation walls
June 10th:  starting pool and finishing building foundation
June 11th:  started framing, and thinking we need a better filtration system for the pool
June 12th:  garage framing just about complete, started building the retaining wall across the back of the new lot
June 15th:  dog ramp (to keep dogs on east side of fence and away from pool while we're gone; fence going in after final grade of lot); pool walls up, framing complete on garage
June 17th:  framed up the main floor of the pool house/gym, plumbed the pool (almost), tied into the city sewer line
June 22nd:  framing on roof, working on the pool, and some more work on the wall
June 23rd:  a little work on the building, a little work on the pool, and a little work on the retaining wall.....
June 24th:  finished boarding up/framing the building, lots of work on the retaining wall, and poured the concrete flooring for the pool
June 29th:  started trimming out the pool house, started the deck on the front, poured the border on the pool and the foundation for the pump/filter stuff
July 1st:  very little progress in the last two days.......
July 4th:  more pics of the pool deck, and some interior shots of the building.
July 9th:  pool coming together, and some of the finishing work starting on the pool house.
July 17th:  lots going on, it just doesn't look like much change in the last week.  Likely to brick the pool house on 20th and 21st.
July 21st:  a couple of days into the brick wrap.  It's supposed to rain/storm tomorrow, so they'll be back at it in a couple of days.
July 24th:  bricking just about complete, and the work is starting on the outdoor wetbar.
August 14th:  poured the concrete!
August 24th:  landscaping complete!
September 22nd:  perhaps the last update, and bonus pics of the 24 Hours of LeMons race car for Joe M.